SYSE.29:4.2 - Compare the transition choices
Consider continued support, narrowed support, coexistence, adaptation, replacement and retirement against the actual user result and constraints. Include the burden and risks of keeping the old provision as well as those of moving.
Identify where old/new configurations can coexist and where they cannot. Recover state correspondence, supported interfaces and the effect of new-only features. Returning an executable, restoring data and repairing forward are different operations. Use SYSE.34 for software persistent-data compatibility and restoration, and the appropriate domain Method for physical recovery.
Keep complete obtaining alternatives with SYSE.24 when the receiving provision itself is still a choice. Migration planning does not prove that the proposed replacement is the better arrangement.
For a proposed transition, work forwards from the old state and backwards from the receiving use. Identify the first point at which the new path can supply the user’s result, and which old dependencies remain necessary until then. Decide where old and new provision may both be available, which one accepts changes to shared state, and how effects made on one side become usable on the other. Where conversion or synchronization is necessary, identify a qualified way to carry it out. A promise to keep two stores in sync leaves that operation unspecified.
Locate the point beyond which return no longer preserves the required result. New-only data, a removed decoder, a revoked permission or consumed material can cross that point. Before it, a tested return may restore the old use; after it, the feasible continuation may be forward repair, a separately qualified restoration with a stated loss, or an authorized interruption. Compare transition choices with that boundary visible.
Choose coexistence duration by the work it permits and the burden it creates. It should give the affected consumers time and means to establish their receiving uses while containing the risk of sustaining old provision. A provider withdrawal date is a constraint on available choices, not evidence that the migration fits. If migration capacity cannot meet it, compare narrower support, another receiving arrangement, an altered commitment and an explicit end of reliance with the holders who can decide them.