Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

SYSE.28:7 - Conformance Checklist

  • The constraint, subject, applicability and deciding authority are supplied.
  • The observation or enforcement Method is adequate for its particular property, or its gap is explicit.
  • Placement accounts for the operations and substitutions that can invalidate the result.
  • Each reuse establishes the receiving criterion through continuity or a qualified relation across the change. A separately required observation is accounted for.
  • Failed, missing and unavailable outcomes reach the dependent action with a usable explanation.
  • An authorized exception leaves failed or missing factual results unchanged.
  • A technical block stops only the dependent action and leaves unrelated work available.