Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

SYSE.28:2 - Problem

Controls placed too early can report a property that is later lost. Controls placed too late can discover a prohibited effect only after it occurs. Repeating the same check at every step can add delay without covering the actual point of loss.

A second failure is to merge different results: advice, an observed property, a technical block and an authorized decision. A successful mechanism does not create authority, while an authorized exception does not turn a failed observation into a pass.