Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:20:05 UTC

SYSE.26:4.5 - Exercise the interaction before relying on it

When a test is needed, try the supported case with a representative user and the intended result consumer. Select further cases from the supported variants and actual failure modes: a valid variation, an invalid or unsupported request, delay where timing matters, and interruption where an operation’s effect may already have occurred. Check that each selected case leaves an intelligible next move and preserves the result’s identity.

A desk walkthrough tests the description. A trial against the actual provision tests more: whether the request reaches the right System, the operation works under the stated conditions and the result can be used. Keep those evidence claims separate. SYSE.12 distinguishes a readiness assessment made before relying work from a later assessment of actual use; SYSE.36 helps observe software-service user tasks. Stop at the design result or bounded trial result that the current decision needs.

Select trial conditions from the design’s actual failure modes. If short-lived access is the critical join, include a delayed preparation. If two operations share the only resource, exercise the intended overlap or its enforced exclusion. Observe what the practitioner can complete and what the provider must do, including any assistance supplied during the trial. Increase reliance only within the conditions that the evidence covers. A well-explained prospective path may be a useful design result while a capability or an unavailable provider still prevents its realization.