Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:20:05 UTC

SYSE.24:4.1 - Name one receiving result and one decision

State the result being sought and its kind; the receiving use and affected Systems; the configuration, operating conditions, horizon, and acceptance claims; the deciding Agent and the commitment it may authorize; and the latest useful decision date. Determine whether the project needs ownership, access, performed work, a reusable account, or continuing capability. If the commission includes delivery of a working configuration now and the maintenance team’s ability to adapt it after a change, compare ways that provide both. The commissioning test can establish that the configuration works. For the second commitment, establish which adaptation decisions and operations the maintenance team can perform with the support it will have. A qualified prior performance or an applicable rule may cover the changed configurations. If it does not, identify the still-open difference and obtain the evidence the decision needs. Carry out a newly commissioned demonstration if the order requires one. Identify any remaining supplier work.

Make acceptance operational enough to work backwards from it. Identify what the receiver must be able to do with the result, which important conditions it must cover, and what would show that the received subject is the one described. For an engineering episteme, identify the observations and interpretive relation needed by the receiving decision. For performed Work, identify the occurrence, subject, window, and result or effect relied on. For access, identify the actual capability, eligible user, usable window, capacity, and permitted use. An access entitlement is not evidence that the task can finish within that window. For a System configuration, include the relevant interfaces and operating states, not merely a catalogue identifier.

Use existing qualified acceptance and specialist results. This pattern does not invent safety criteria, measurement validity, legal rights, or operating commitments. When the project system-of-interest or intended use itself is unsettled, return to A.15.6, SYSE.1, SYSE.16, and SYSE.2. When one criterion is unresolved, name that input and preserve the other usable parts. A conditional comparison can show which alternatives depend on its answer; it cannot authorize reliance that requires the missing answer.

Protect the conditions that cannot be traded away. State the relevant horizon explicitly: first acceptance, three years of changed configurations, repeat interpretation of retained data, or another use that matters to the decision. Longer support and ownership can cost more without helping a one-time result; conversely, a cheap first result may fail a continuing need. Keep any proposed change of acceptance or horizon as a separate authorized question.