Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

SYSE.23:9 - Consequences

The project gains a practical answer to where should we invest so that the named later changes become reachable and affordable? Redesign of the project system-of-interest, family architecture, builder reconfiguration, platform Work, Method change, and separately justified capability or organization work can be compared while keeping their subjects and relation types distinct. Genuine cross-level conflicts remain visible. Possible-future benefits do not enter the current baseline.

The cost is a more disciplined claim and architecture account. There may be no single evolvability number, and the best first decision may improve only one change family. Some constraints require a neighboring DPF or specialist source; a bounded project cannot establish profession-wide cultural continuation or unlimited open-endedness.