SYSE.23:4.2 - Record the Result
Record the following content for the stated decision using linked descriptions. Keep the different claim kinds, decisions and observations distinguishable; each claim keeps its own subject and scope. Include view-specific content only for views used in this decision.
| Account content | What to record |
|---|---|
| decision boundary | Project system-of-interest when it already exists, or the intended-system claim when it does not; any System family with its membership and effectivity basis; configurations, expected change family, use, environment, affected Systems, horizon, scale, protected characteristics, resources, DecisionSubject, chooser granularity, authority, and receiving decision. |
| current claim inventory | Claim kind; identified subject; architecture bearer and selected structure, capability holder and target Work, change-Work occurrence and its result/resource coordinates, joint-arrangement participants and relations, or the link between a changed structure or capability and an attributed outcome, with its mechanism and the comparison or intervention that supports the attribution; scale, window, evidence, uncertainty, and material limits on use. |
| composition and family membership | The constituent parts and interactions relevant to each System or Work whole. Separately, the membership and variation rules covering the family. State which local or shared consequence changes the investment and how it follows across the specified range. |
| system-of-interest–builder relation view | EntityOfConcern; selected structures of the project system-of-interest and builder arrangement; the direct dependency, correspondence, provider, service, interface, or enabling relations used by this decision; consequence, moved burden, evidence, uncertainty, and any causal claim that lacks support. |
| Method and Work views | Required constituent operations or results supplied externally; actual performances belonging to this change, performing Agents and enacted Methods; any required order, overlap, recurrence, assignment and authority. |
| possible-future specifications | Proposed selected structures and mechanisms, expected characteristic changes, required realization and evaluation Work, assumptions, and failure conditions. |
| alternatives and comparison | Incumbent and materially different changes to the project system-of-interest, builder arrangement, or both; current and candidate configurations; result and resource vectors; guardrails; interactions; uncertainty; reversibility; future-option effects; and displaced burdens. |
investment ChoiceResult | DecisionSubject and granularity; stable OptionSet; shared comparison basis; ChoiceRule; probe budget, cost, and value when relevant; choose, tie-set, reject, probe, or reroute result; why the ChoiceRule permits this result now; protected losses; budget; implementation request if any; and overturn conditions. |
| later Work and observation | Identify a WorkPlan or authorization when it exists. For an implemented change, identify the Work and the structures it changed. When representative future changes are observed, record the cases, consequences for affected Systems, which claims the observations support or defeat, the separate grounds for any attribution and feedback to the work that uses it. |