SYSE.22:5 - Worked Case: Heat-Pump Controller Family

In this constructed case, a manufacturer maintains heat-pump controllers for occupied apartment buildings. The current decision concerns the controller family and a reversible building pilot. Installed controllers and a laboratory unit are actual Systems; the options below are possible-future specifications under the family’s architecture and effectivity rules.

The earlier selected problem was peak electrical demand during cold mornings. The preferred specification used a schedule optimizer and cloud forecast service. These three field observations now reopen the comparison:

  1. several buildings lose network service during the coldest periods;
  2. compressor cycling increases service calls in one installed configuration; and
  3. a new tariff rewards short demand reductions but penalizes slow recovery that leaves occupants cold.

The current problem portfolio and System-family options produce four correspondence rows:

Problem recordSystem-family optionDecision-bearing correspondence
peak demand, now with recovery-time and occupied-temperature acceptancecloud schedule specificationNetwork loss makes the option inadmissible without a qualified fallback; recovery time enters comparison.
network-loss continuitylocal-fallback specificationLocal forecasting can change continuity and recovery, but processor-load and fallback evidence are missing.
compressor cycling for the affected configurationvariable-speed-control specification and incumbent controlVariable speed can change cycling and energy use while increasing calibration and service burden.
speculative voice-control request, retained only in the archivevoice-gateway specification, retained only in the option archiveNo current use or affected-System consequence gives this pair decision priority.

The final row explains archive retention and current non-selection; it supplies no OptionSet member. The first three rows are the complete correspondence set used by the current decision.

The earlier Front compared energy use and peak demand. The current comparison uses a new candidate set and eight characteristics: continuity, recovery time, occupied-zone temperature, peak power, compressor cycling, processor load, calibration effort and service burden. Establish eligibility and compare the surviving options on this basis before declaring the new Front.

The fixed current OptionSet has three members:

  1. continue developing the cloud-schedule specification;
  2. develop the local-fallback specification; or
  3. develop the variable-speed-control specification.

Safety and occupied-zone comfort are hard guards. The remaining characteristics are compared by a partial order. The cloud-schedule specification without a qualified fallback fails the network-loss guard. Variable-speed control retains the incumbent local control and is admitted in configurations with the matching output board. Local fallback still lacks evidence about processor load and cold recovery in the two configurations proposed for it.

The controller-family council is the deciding Agent. Its current assignment authorizes it to choose the next engineering probe, or decline new probing on the present basis, and allocate no more than 160 engineering hours. A building operations manager authorizes any occupied-building trial; the product-family owner authorizes later adoption. The probe choice grants neither authority.

The council uses one shared comparison basis:

  • The fixed OptionSet remains cloud schedule, local fallback, and variable-speed control.
  • The current BeliefState contains the three field observations, the hard safety and comfort guards, the cloud option’s network-loss failure, the variable-speed option’s admitted local control, and the missing local-fallback processor-load and recovery evidence.
  • The OutcomeModel specifies which observation changes admission. To qualify local fallback for both proposed configurations, it must pass in each. A demonstrated failure in either excludes that two-configuration proposal. Keep the observation for each configuration, including any narrower use it supports. Compare local fallback and variable-speed control for the same buildings and conditions where both are applicable. The calibration trial changes estimates of variable-speed burden while leaving the local-fallback admission question open.
Candidate next probeBounded burdenDistinguishing observationsEffect on the current decision
Scripted network-loss and cold-recovery trial96 engineering hours, two hardware-in-the-loop bench days, one three-day reversible building-pilot window, and about one week of decision delay.In each of two representative building configurations: no safety violation; occupied-zone recovery inside 20 minutes; and controller processor load below 70%. The outcome is contrary if either configuration has an established safety or comfort guard failure or a processor load at or above 70%. Incomplete, uncertain or otherwise non-decisive observations remain unresolved only when no such failure has been established.A pass in both admits local fallback for the two tested configurations. Where variable-speed control is also applicable, both options can now be compared and their ordering is open. A demonstrated failure rules out the joint proposal. Record which configuration failed and which claims still hold for the other. If the evidence is inconclusive, report which admission question remains open. The council can finish with that result or consider further work when the investment decision warrants it.
Variable-speed calibration trial128 engineering hours, four calibration-rig days, the same single building-pilot allocation, and about two weeks of decision delay.Calibration effort and service burden may fall or rise within the currently supported range; the trial does not observe network-loss recovery or local-fallback processor load.Either bounded outcome refines the burden comparison for variable-speed control within its supported configurations. The local-fallback admission question remains open.
No probeNo immediate trial resource use or delay; preserves the scarce pilot allocation and engineering capacity.No new observation.Retain the qualified current comparison: cloud-only fails the guard, variable-speed control remains admitted in its supported configurations, and admission of local fallback for both proposed configurations remains open. Later development or adoption still belongs to its competent owner.

The ChoiceRule compares obtainable probes with using the evidence already available. The network-loss trial can settle whether the council may include local fallback in the next development comparison. In the first resource situation of this case, the council judges that resolving this question before the next family investment is worth the 96 hours, scarce pilot allocation and one-week delay. Assume that capable performers and the windows can be obtained, and that this allocation does not displace more valuable protective or development Work. Those benefits, costs and conditions support selection within the 160-hour ceiling. The calibration trial cannot resolve that question. The deciding Agent applies C.11 and records ChoiceResult-HPF-1 = probe_again for the network-loss and cold-recovery trial.

In the paired resource situation, the same discriminator would consume the only pilot window needed for already supported protective maintenance, or no competent performer can use it before the investment decision. The council can decline that probe and retain the qualified comparison above. Local fallback stays unresolved; no observation or safety assurance is invented. A later owner can make a supported bounded development choice among admitted options.

In the selected-probe situation, after that ChoiceResult, a planning Agent must prepare the trial plan, the building operations manager must authorize the occupied-building trial, and assigned Agents must perform and interpret the Work. Family adoption remains a separate decision by the product-family owner. If pilot authority is withdrawn before the trial Work, a new decision pass records reroute and the missing authority without rewriting ChoiceResult-HPF-1. For a later observation, reconsider any of the three current problem–option correspondences and family results that depend on what changed. The voice-control archive entry remains unchanged.

For currentness, first keep the same configurations, relied-on observations, calibration, rights and supported use while only the source export date changes: the comparison remains usable. Now change a controller configuration so that the relied-on processor-load evidence no longer covers it, or let a calibration or pilot permission window end. Reopen or suspend the uses that relied on the changed condition. Keep the needed qualification with the comparison for later receivers. The case’s 20-minute and 70% limits are receiving acceptance conditions, not universal thresholds supplied by this pattern. Their protective basis and any proposed amendment require the relevant engineering judgement and authority; merely choosing or declining a probe changes neither.

SYSE.22:5.1 - Construct the family account behind the probe and use its return

The heat-pump case starts with observations, not three fully formed alternatives. To obtain the specifications above, the engineers first retain the outside need for acceptable heating and change the problem from peak reduction alone to peak reduction with continuity and timely recovery. Following SYSE.2:4.3, they trace the cloud command through the connection, local controller and compressor to the occupied-zone effect. The trace exposes the missing behaviour during disconnection. Continuing with only a lower peak-power target would leave that failure intact.

They then vary the means at the failed connection. One proposal adds an independently functioning local mode; another changes compressor control while retaining the existing local protection. The cloud-only proposal is kept in the comparison long enough to show why it fails the revised condition. Voice control does not repair that connection and stays outside the selected portfolio.

For this constructed account, assume the larger processor is available only in two controller configurations, and that the variable-speed compressor needs its matching output board. The option descriptions therefore name those combinations and the effectivity proposal; they do not offer every feature on every installed unit. The local-fallback option’s conditional status is precise: a plausible configuration exists, but the current decision lacks the load and recovery evidence that would permit its admission. The rig and occupied-building window in §5 explain how that uncertainty could be resolved.

Now suppose the authorized trial passes in both configurations with the larger processor. Local fallback qualifies there. Variable-speed control qualifies where its matching output board is available. For a building where both options qualify, a comparison showing that each has an advantage on a different declared characteristic would keep both on the Front for this two-option comparison. The trial alone leaves that ordering open. These results support the family owner’s comparison for the applicable buildings. Release and use on other boards require their own grounds. The problem portfolio still has three selected problems, and the voice-control request remains in the archive.

The next supplier-change inquiry reveals that producing and assuring more combinations with rig R4 requires repeated interface work. The returned SYSE.23 question is specific: for the named controller family and next supplier replacement, which target, rig and evidence changes would reduce that repeated work while preserving the existing comfort and configuration limits? Local-fallback evidence supplies one applicable input; it does not settle the supplier interface or evidence-reuse questions in SYSE.23:5.

Changed condition. Suppose a later building requires the smaller processor, on which the fallback algorithm would exceed the same load limit. The passed trial remains valid for its two configurations. The revised family account keeps the supported larger-processor member where applicable. The same fallback specification fails the smaller-processor condition and is excluded for that use; it is not merely awaiting more evidence. Incumbent local control can retain its previously supported use while a different algorithm or board is considered for the unmet demand. The owner compares a separate branch’s supply, configuration and service burden with replacing the small board. Reclassifying the small-board building as “not a customer” would change the problem scope and require its own grounds and authority; it would not demonstrate that the fallback solves the original use.

SYSE.22 changes which problem–variant pairs are worth pursuing; SYSE.23 can change the means and burden of reaching them. Either result can stand for its own decision while the other remains unresolved.