SYSE.22:12 - Relations
SYSE.1,SYSE.16, andSYSE.17supply project focus, operational environment, and affected-System consequences for compatible uses.SYSE.2,SYSE.6,SYSE.7,SYSE.10, andSYSE.13supply linked concepts, architecture decisions, descriptions, evidence, and family/configuration/effectivity identity.SYSE.15can supply a compatible engineering-Method repertoire.SYSE.21can supply bounded observations of an enacted variant and its population; each claim keeps its own evidence and transfer boundary.C.40.CD:4.1–4.6supplies the general reciprocal development of a question and a way;SYSE.22:4.1.1–4.1.6binds its use here to family compatibility, realization and receiving decisions.SYSE.2:4.3–4.6supplies the linked use–concept construction, andSYSE.3:4.2–4.4the realization branch.C.22.2governsProblemCardepistemes andC.22.PFRany world-sideProblematicForRelation.C.17,C.18,C.19,G.5, andG.11govern characterization, archives and Fronts, live pools, selected sets, and use-qualified currentness.SYSE.19andSYSE.23retain changed-premise and claim-specific receiving rules.C.11.CRCgoverns finite configuration-relative contribution comparisons andC.11the bounded choice.- Supply the project focus, selected problem portfolio, System-family option set, correspondences, unresolved
mismatches, and current
ChoiceResultfromSYSE.22to the Agent usingSYSE.23for an investment or reconfiguration decision. - Feedback reopens
SYSE.2,SYSE.6, orSYSE.13only when the changed result crosses their stated reopen condition. - Decision Design, Strategy, Method Engineering, and Operations Management retain their domain Methods even when their Work uses the same archives or decisions.