Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.21:4.1.5 - Make the selected way available to receiving Work

When intervention is selected, use FPF A.3.1.MI:4.1–A.3.1.MI:4.5 for introducing the target Method and deciding what to retain or adapt. Carry into that introduction the engineering variant, its applicable configuration and profile, its result-use connections, non-negotiable limits, obtaining conditions and supported scope. The introduction strategy can change without changing the target Method; a change to the engineering operation needs its own affected-use reconsideration.

Prepare what a receiving practitioner needs at the point of action: the applicable description and worked example, permitted inputs and tools, reasons for the consequential choices, recognition of a branch or stop, and access to necessary expertise and response. Explain which technical choices are fixed by the receiving use and which remain open. Let receiving engineers expose an incompatible interface, missing datum or impossible review demand; use that information to repair the variant or its conditions. Technical explanation and joint problem solving support uptake without replacing another Agent’s specialist authority.

To establish transmission, identify what reached which receiving practitioners and how. The recipient may gain access to a usable description or observe another agent demonstrating the relevant operation. Record what the evidence establishes about that access or observation. Receiving enactment requires the receiving Agent to perform the Method under the applicable conditions. Observe which assistance that Work used before claiming independent capability or a readily repeatable practice. Arrange later retrieval and support where continuation depends on them: maintained configuration mappings, examples of accepted and rejected impacts, review capacity, usable feedback and an accountable response.

Use OCE.10 when the selected response changes participation or working-culture conditions. Obtain an organizational decision for changed responsibility or authority; do not embed that decision in an engineering instruction. Use HCD.1 when a receiving decision depends on an identified need to develop a human capability. A functioning existing capability, or a failure attributable to unavailable access, does not create a training requirement.