Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:20:05 UTC

SYSE.1:7 - Conformance Checklist

IDRequirement
CC-SYSE1-1A conforming use SHALL name the current project and the decision that needs a project-system choice.
CC-SYSE1-2It SHALL retain a direct non-System subject when System designation is not needed, and SHALL use A.1.SCR when actual System recognition remains load-bearing.
CC-SYSE1-3It SHALL distinguish an actual System from an intended referent in plan, decision, or description content.
CC-SYSE1-4When a product SoI designation is needed, the first useful account SHALL name the product SoI or intended referent, its actual or proposed extended enterprise, agreements, agents’ objectives and intended use or withdrawal from use, any main unresolved assumption and reopen condition; when the local engineering subject differs, it SHALL preserve that subject and the bounded result needed from it.
CC-SYSE1-5When materially different actual Systems or intended System referents remain plausible, the account SHALL compare their decision-relevant claims and SHALL keep every non-System subject under its direct pattern rather than admit it as a candidate referent for the project system-of-interest.
CC-SYSE1-6Additional account content SHALL be added only when it changes the current choice or a downstream use.
CC-SYSE1-7A stop SHALL answer the identification or coordination question or state which needed connection remains unresolved; a reopen SHALL name evidence or a changed project condition that can alter the choice.
CC-SYSE1-8Related projects SHALL retain their own work boundaries and acceptance while preserving a common product SoI where they serve the same product. A different contract or performer SHALL NOT alone justify another SoI for organizational work; an independent supplier product needs its own use, decision and acceptance grounds.
CC-SYSE1-9Before coordinated Work relies on a shared focus, the relevant contributors SHALL establish a common referent and the contribution connections needed for that decision, or identify the unresolved mismatch and limit the dependent coordination. A record of the contributors’ decisions or responses MAY establish agreement for the stated use. A proposal awaiting those decisions leaves their agreement open.