SYSE.1:5.1 - Pumping station under flood risk
A flood-reduction project starts with the phrase “new pump”. The engineer compares the pump unit, the pumping station, the drainage-control System, and a provider arrangement. Flood-control use crosses the pump-unit boundary: positioning, power, control, discharge conditions, and downstream exposure belong to the station’s current use question. The operator, design organization and construction provider have agreed their work and decision responsibilities for obtaining the station. The engineer uses that extended-enterprise basis to propose the intended pumping station as SoI and records:
selected referent: intended pumping station
extended enterprise: operator, design organization and construction provider under the agreed responsibilities
current reason: move water under the selected flood load as part of flood-control use
main unresolved assumption: downstream exposure remains acceptable
reopen: use, architecture, realization, or operating evidence changes that assumption or boundary
SYSE.2 can now link the flood-load use claim to a station concept.
Later discovery that the proposed station increases downstream harm changes the linked use claim. It reopens
the project-system choice only when that changed claim defeats the reason or boundary used by the choice account.