Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.1:4.5 - Reopen the choice from the answer that failed

Reopen the account when one of these changes the comparison:

  • observed or expected use crosses the assumed boundary;
  • authority or permission makes the intended change unavailable;
  • an architecture candidate moves important functioning to another System;
  • no feasible realization branch supports the selected referent;
  • operating or assurance evidence defeats the reason for the choice; or
  • a changed product or intended use materially changes the grounds of the cooperation.

A project split, new contract or changed performer can reopen local scope, provision or authority without changing the product SoI. Reconsider that designation when its product, use or extended-enterprise agreement grounds change.

An observed mismatch between contributors reopens the common-focus claim in §4.4.1 even when the individual choice remains defensible. Repeat only the exchange affected by that mismatch; reconsider the SoI designation if its product, intended-use or extended-enterprise agreement grounds have changed.

Return to the failed claim or linked claims that affect the next move. A changed use assumption may require SYSE.2 before the project focus changes. A failed bearer or architecture candidate may return through C.30 or C.32. Reopen the SoI designation when the evidence changes its product, intended use or extended-enterprise agreement grounds. Reopen the local engineering subject or acceptance separately when those are the affected claims.