Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

SYSE.19:7 - Conformance Checklist

  • The predecessor and later or replacement source epistemes are identified.
  • The relation between the sources is established for this comparison: apply C.2.1 when they are editions of the same episteme, identify a replacement when supported, or state the identity gap.
  • Material claim changes are separated from publication and carrier changes.
  • Every affected use names the source claim, receiving decision or Work result, and direct-reliance relation.
  • A searched frame distinguishes dependent, irrelevant and unresolved uses; equivalent irrelevant mentions can be grouped. Actual-use support and coverage justify any no-impact claim. Stop tracing a branch once the changed premise can no longer affect a receiving conclusion.
  • Any selected revalidation Work warrants its complete burden for this use. Its plan identifies the performer, Method, configuration, conditions, evidence needed, authority, expected contribution and stop. If Work has been performed, identify the result returned.
  • Where a material claim change affects an engineering argument, its consequences have been examined in that argument. If revalidation is proposed, the chosen work can supply the required contribution for its range and whole-use conditions.
  • Surviving observations, revised interpretations and replacement decisions remain distinct; coupled changes are considered together when their combined effect can alter the receiving decision.
  • The impact decision has its own grounds. Keep any claims about performed Work, evidence, permission, assurance and a release decision distinct, and identify the grounds for each claim the receiver relies on.
  • Historical source editions and decisions remain recoverable for their original uses and intervals.
  • The receiver gets the sufficient branch result and its material limits. A harmless reference repair or direct engineering answer closes without a duplicate record; next Work is included only when selected.