SYSE.18:4.2 - Record the Result
| Field | Required content |
|---|---|
| shared use | Result or use, conditions, interval, affected Systems, current decision, and deciding Agent. |
| constituent Systems and relations | Actual Systems, configurations, other uses, reasons for inclusion, and one direct relation or stated gap for every relied-on contribution or constraint. |
| decisions and authority | Ownership and other governing relations, deciding Agents, assignments when relevant, authority, permissions, conflicts, escalation, and decision-centre boundaries. |
| commitments and interoperability | The commitments, bearers, conditions, interfaces, capacities, timings, notice, withdrawal and recovery provisions on which the decision relies. For a claim about actual interoperability, identify the evidence of usable exchange under the relevant configuration. |
| alternatives and choice | Arrangements compared for the same result and interval; decisive conditions, whole burden and accepted losses; selected or conditional continuation, any required outside decisions, unsupported dependencies or next Work. |
| later integration, when current | Performing Agent, Method, dated Work, change or new relation and resulting configuration. For a claim about coordination in use, give the relevant observations and their limits. |
| decision use and reopen | What the decision supports in the receiving work, the grounds for any later observed-coordination claim, any available fallback or remaining gap, and the conditions for reconsidering affected claims. |
A preparation decision can be made before implementation. If integration Work follows, distinguish it from the decision. If coordination in use is claimed, give the observations that support that claim. An observation of joint operation establishes fulfilment of a particular commitment only if the evidence covers that duty and its conditions.