Recover the Systems, structures, relations and conditions needed to ground one use decision. Begin with the actual System or intended System referent selected for engineering and its named use situation; stop when the account supports the receiving decision or identifies the condition that prevents it.

Reuse an adequate existing account or direct relation result for the same decision and conditions. Use the bounded recovery below when a missing connection prevents that answer. If the operating situations themselves need development or agreement, use a suitable scenario or concept-of-operations Method; obtain any missing specialist result from its domain before relying on it.

SYSE.16:4.1 - Perform the Move

  1. Bound the use and decision. State the actual System or intended System referent selected for engineering, its use situation, configuration or variant, decision, relevant place, horizon and description sources. When it is a creator, retain the products or classes of use that ground the required contribution and local acceptance. Keep the descriptions separate from the Systems and situation. Choose the bounds from differences that could change the recipient’s action or its grounds. The same System can serve different uses; a change in a surrounding connection may therefore change the answer. When the available account combines contributions, ask which different arrangements could yield the same reported condition. Trace any consequential difference back to its parts or operation. A condition common to all admitted arrangements can already settle the decision.
  2. Find the containing and receiving Systems that bear on the decision. Identify the larger Systems whose part–whole relations matter and those whose receipt or use of a result could change the answer. Account for every recipient when complete coverage is commissioned. For each relevant connection, establish whether it is actual or proposed.
  3. Recover functional organization. Identify the transformation flows, interactions, and contributions in which the System participates, including the changed or receiving Systems and conditions. Use A.6.F for function-like claims and E.18.NET when a transformation-flow network is needed.
  4. Recover constructive organization. Identify the structures that matter to this use—for example, parts, bearers, modules, interfaces, or connections. Use A.22 for each selected structure and A.6.M only when module or interface claims obtain. Do not infer constructive parthood from a functional contribution.
  5. Add other Systems and conditions. Include only a System or condition whose named relation can alter the use result or engineering choice. State that relation and its participants or state the relevant condition. Examples include a transfer from a named supplier System to a named receiver, access granted by a provider System, a permission or commitment between named participants, an available resource, or an operating constraint. When performed provider Work matters, identify the dated Work occurrence, performer Agent, and applied Method separately. For proposed provider Work, identify the intended Work, performer and Method, and the commitment or capability evidence available. Then name only the direct relations used by the decision: Agent participation in the Work, result production, supply or access from provider to receiver, receipt or use of the result, a commitment, or another governed provision relation. Distinguish obtaining relations from proposed ones. A commitment does not establish that Work or delivery occurred.
  6. Separate future choices from present facts. Mark descriptions as observations, predictions, design choices, commitments, or unsupported assumptions. A proposed interface or whole does not obtain merely because a model contains it.
  7. Test outside change. Ask which relevant outside factors—for example, Systems, conditions, interfaces, providers, uses, or regulations—can change during the relevant horizon and which change would reopen the concept, architecture, offering, assurance, or configuration decision.
  8. Return the result needed by the decision. Supply the supported relations and conditions, or the material mismatch, alternative, evidence need or unresolved assumption, to the receiving engineering Work.

The numbered steps explain the Method. Determine Work order from the dependencies and conditions of the work. Observation, concept development, architecture development and trials can overlap and recur while outside Systems change.

SYSE.16:4.2 - Record the Result

FieldRequired content
focus and decisionActual System or intended referent being engineered, its use, receiving decision, configuration, relevant place and horizon; for a creator, the product uses and contribution that ground its capability and local acceptance.
containing and receiving SystemsEach larger or receiving System and the proper-part, transfer, interaction, or other direct relation that matters.
functional organizationSelected transformations, flows, interactions, contributions, changed or receiving Systems, and operating conditions.
constructive organizationSelected parts, bearers, interfaces, modules, and connections needed by the use.
other Systems and conditionsProviders, users, resources, constraints, and their stated obtaining or possible-future relations.
epistemic statusObservation, evidence-backed claim, prediction, design choice, commitment, or unsupported assumption.
co-change and returnOutside changes that reopen the decision, evidence that would reveal them, and the supported result, mismatch, alternative, or missing result supplied to receiving Work.

For a bounded first result, one decision-changing containing or neighbouring System, one named relation or condition, its epistemic status and one result for that decision may suffice. For an unknown that can change the result, state which decision it blocks. Use several representations when needed, keeping them distinct from the use situation and System whole they describe.

SYSE.16:4.3 - What Changes in Practice

The engineer identifies the Systems, structures, direct relations, and conditions that make this use work. Functional transformation and constructive structure stay separate, outside change becomes an engineering input, and the account identifies any assumptions that remain unsupported.