Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

SYSE.15:7 - Conformance Checklist

  • The System to be created, changed, maintained or withdrawn from use, recurring engineering result, receiving decision, conditions, and protected losses are stated.
  • Every Method remains distinct from descriptions, tools, Work, performing Agents, assignments, capabilities, evidence, provider arrangements, and cultural relations.
  • Each Method has a reusable action, participant meanings, applicability, intended result, and limits.
  • A narrower engineering Method is retained only when its specialization changes useful and warranted action at comparable effort.
  • The account distinguishes the supported classifications, whole–part relations, alternatives, replacements, result uses, compatibility claims and Work timing relevant to this choice.
  • Consequential interactions among Methods have adequate evidence from engineering Work or a qualified argument applying to the required conditions. Any commissioned performance is accounted for; discretionary further Work addresses a consequential open question.
  • Missing capability, assignment, provider, platform, permission, evidence, or authority is returned to its own decision rather than hidden as a Method defect.
  • Project evidence and expert estimates remain distinct from visibility, declared conformance, and cultural prevalence.
  • The account gives each candidate’s disposition—retained now or as an alternative, replaced, excluded, proposed for development or unresolved—and the material conditions that would reopen the choice.