Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.15:4.1 - Perform the Move

  1. Name the engineering result and receiving decision. State the actual or intended System selected for engineering, relevant use, configuration, conditions, horizon, account users and the recurring result whose Method is being chosen or reconsidered. For a creator, keep its product-use grounds and local acceptance identifiable.
  2. Recover candidate Methods from available practice. An engineer’s account or an observed performance can reveal the operations, participants, intended result and conditions. A failure can expose a dependency missing from an otherwise successful account. Use the cases needed for the reliance claimed. For a proposed way with no previous performance, recover its construction, required capabilities and application conditions from the design. For a claim about an actual occurrence, establish who performed the work and what their assignment or authority covered where these affect reliance.
  3. Recover candidates from sources without importing the source whole. Inspect relevant sources—for example, standards, handbooks, lifecycles, model-based frameworks, AI workflows, or local traditions. Apply A.3.1 before identifying a Method and A.3.2 before relying on a MethodDescription. Keep an unresolved cue when the reusable way cannot yet be stated.
  4. Compare the same result under the same conditions. Hold the result, System kind, use, configuration, evidence needs and protected losses stable while varying the Method. A new tool, description, assignment or parameter need not change the Method. State the criterion the decision maker will use to choose among feasible options, including continuing with an adequate existing Method. Compare the work needed through the receiving result, including material preparation, adaptation, review and integration costs.
  5. Test whether specialization changes the work. Compare a narrower engineering Method with the broader FPF or DPF move at comparable effort. Retain the specialization only when it changes what practitioners notice, decide, do, obtain, check, or use as a stop or return, and that difference is useful and warranted for this domain. A domain noun or extra example is insufficient.
  6. State each Method relation separately. Record broader-kind classifications, participation in whole Methods, alternatives, refinements or replacements, result-use dependencies, and compatibility only when the corresponding conditions hold. Do not infer any of them from a list, vertical diagram, shared source, or Work order.
  7. Examine the interaction that matters. Use observed Work, a qualified calculation or another sufficient argument for its effect on the result, integration loss, time, costs, protected characteristics and available means. Two mandatory tests that each consume the only specimen cannot both be completed on it; their stated destructive effects and the available stock suffice to exclude that plan. If the commission calls for an actual trial, identify its required performance separately. Select discretionary trials for the consequential uncertainty they can resolve.
  8. Make the repertoire decision. The authorized Agent records which Methods are retained now, retained as alternatives, replaced, excluded for this use, proposed for development, or unresolved. Explain the selected disposition from the criterion and grounds, including the accepted burden or loss. For a partial repertoire, name the configurations it covers and those still awaiting a suitable Method. To claim coverage for a whole set, establish a suitable Method for each configuration. If Method choice depends on the configuration, show which observable distinction the authorized team needs in time to choose. A common Method that works in every configuration still possible can suffice without identifying the exact configuration. If the team can use any retained Method interchangeably, show the evidence or engineering rationale for each allowed substitution. If a retained Method lacks a capable Agent, provider, platform, or assignment, record that separate gap and send it to the appropriate capability, provider, platform, or obtaining-arrangement decision.
  9. State evidence, currentness, and return conditions. Give each relied-on claim its epistemic status— for example, project observation, qualified expert estimate, institutional description, academic or press visibility, declared conformance, or evidence of enacted practice. Reopen only when a changed result, source, Method, project condition, capability, provider, or platform can change the decision.

The numbered steps explain the Method. Source inquiry, modeling, realization, integration, assurance, platform development, and Method development can overlap and recur; choose Work order from the dependencies among those activities.