Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

SYSE.14:7 - Conformance Checklist

  • The scope and authority of the decision cover the uses in the proposed release, including any required joint operation. A narrower disposition states which work it permits and what remains outstanding.
  • The configuration basis covers the release subject, its applicable conditions and the same next-use decision, including the actual units when the release concerns them.
  • The decision uses each approval or completion status only for what it establishes. Any required permission, claimed installation or resulting configuration has its own support.
  • Consequence tracing reaches affected Systems and direct relations, not only files, departments, or links.
  • Every relied-on authority, permission, and evidence result has the subject, scope, interval, and source needed by the decision.
  • The comparison basis, selected disposition, retained alternatives, acceptable losses and any material uncertainty are recoverable. Any live inquiry alternative is resolved sufficiently for the choice, with the judgement or limitation needed by the decision or its recipient; inactive inquiry adds no entry.
  • Any claimed implementation identifies the performing Agent, dated Work, Method, actual transformation, resulting configuration, and evidence.
  • The disposition identifies its grounds, whether a technical limit was exceeded, a required acceptance condition was unmet, or a narrower use qualifies. It states the permitted next Work and conditions for withdrawal or reconsideration.