Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

SYSE.14:4.1 - Perform the Move

  1. Bound the release question. Recover the subject, use, effective interval and deciding authority from the proposed release. Follow the use to the units and dependencies that could change that decision. If separately acceptable units are to operate together, check the interfaces, shared support and permissions needed in that arrangement. If only a subset qualifies, establish whether the authority can release it separately and what obligation remains for the rest. The options may include release, trial, withholding, rejection or obtaining a missing result.
  2. Establish the configuration and effectivity. Use a compatible SYSE.13 result or qualified direct sources for the descriptions, configurations, units, sites, intervals and conditions relevant to this release. When a necessary correspondence is missing, identify it and the release decision it prevents.
  3. Separate the trigger from the candidate. Record the event that prompted reconsideration—for example, a request, criticism, incident, opportunity, or source change—with its evidence status. Describe viable change candidates separately. Keep the unchanged-System option when viable; treat deferral as a decision to await an event or obtain another result.
  4. Trace the consequences that bear on the choice or its conditions. Identify the affected Systems and relations, descriptions, realization or integration Work, provider and receiving Agents, obligations, supporting evidence and reversibility that matter to this decision. Use files, team names and links to find the relevant records or Agents, then establish the engineering objects and relations affected.
  5. Name the Agents and governing relations. Identify the deciding and receiving Agents, who grants any required permission, and who is assigned to perform later Work when that assignment bears on this decision. State the applicable assignments, authority, permissions, conflicts of interest and abstention conditions separately.
  6. Qualify the evidence. Connect each evidence result—for example, a test result, model evaluation, trial observation, specialist result, or assurance result—to the claims, configurations, conditions, and uses it supports. When a relied-on source changed, use a compatible SYSE.19 result or reopen the affected claim directly.
  7. Compare the current options. Hold the option set and comparison basis stable long enough to choose. State protected characteristics, acceptable losses and any material uncertainty. Use C.11 for the choice. If further evidence could change the choice or its warranted use, compare the cost of obtaining the next feasible observation with its value for the decision. Retain any inquiry judgement or limitation the decision or recipient needs. Choosing to proceed on the available evidence requires no new observation proposal or inquiry record.
  8. State and return the release decision. Name the selected disposition, subject, effectivity, conditions, evidence, authority and any required permissions. State the permitted next Work, any unresolved risks or withheld scope, and what would reopen the decision. Apply the acceptance rule to its own subject. An attainable breach refutes an all-conditions guarantee. A required document absent at the deadline can warrant return while physical performance remains open. Check supported units or conditions against their other technical and permission requirements before disposing of a narrower offer.
  9. Connect later realization. Establish the configuration and properties on which the next use depends. A recipient who can open the released archive and verify its contents may have enough evidence for that use while the identity of its installer remains unknown. An account of implementation or integration as performed Work also needs the performing Agent, dated Work, Method and actual transformation. Update the descriptions and notify the recipients affected by what was established.

A release for realization can occur before implementation; release to service can depend on later implementation and observation; emergency containment Work can precede a full technical choice under its own authority. The case must state which dependencies and timing apply.