Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.14:12 - Relations

  • C.11 governs choice among current options. A.21 governs a gate decision. A.2.8.PER governs permission, A.15.1 Work, A.3.4 actual transformation, F.10 status, A.10 evidence, and B.3 assurance. This pattern connects the relevant results for one engineering release.
  • C.2.1, E.17, and E.24.PUB keep change descriptions, decision epistemes, publications, forms, and carriers distinct from the changed System and performed Work.
  • SYSE.13 can identify configuration and effectivity for this release directly or through a supported correspondence. Permission and release require the applicable governing decisions.
  • A compatible SYSE.19 result supplies revision consequences only for decisions that relied on the changed source. Use it before a release when the change bears on that choice, or return to an existing release when a later or newly discovered change bears on its grounds.
  • An operating or maintenance result can establish restored function for a particular unit. Use it for another configuration or condition when the relied-on property carries across on a stated basis; use SYSE.14 and the governing authority for release.
  • SYSE.14 can supply bounded evidence to SYSE.4 for the same release question and evidence window. Use a matching assurance judgement where it already exists; when one is needed, obtain it through the applicable assurance work.
  • Application moves—such as software deployment, electrical energization, medical-device release, ship alteration, building commissioning, or manufacturing release—may specialize the Method because their project Systems-of-interest, permissions, evidence, and effectivity differ.