Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

SYSE.13:7 - Conformance Checklist

  • The configuration basis covers the receiving decisions and the differences that could change them.
  • Item boundaries and identifiers resolve the subjects the work must distinguish. A family or lot claim has grounds for the members and conditions it covers.
  • A conclusion using a description, package, installation or observation has the correspondence it needs to the configuration in question.
  • Each load-bearing effectivity claim names the units or lots, sites, intervals, and conditions required by the use.
  • Cross-scheme mappings state direction, preserved meaning, loss, evidence, and use limits.
  • Any baseline serves the stated comparison; configuration claims carry their evidence limits; a required release or permission is distinguished from performed installation.
  • The basis records any collisions, unsupported correspondences or missing evidence, along with receiving Work, revision authority, and conditions for reconsidering the affected claims.