Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

SYSE.13:12 - Relations

  • A.1 and A.1.SCR distinguish actual Systems from intended referents. A.22 governs selected structures, A.19.SPR state-like claims, and C.27.TA temporal aspects. Use the relevant identity, structure and temporal results when preparing the configuration basis for the decision.
  • C.2.1 keeps descriptions, editions, subjects, reference schemes, carriers, and publications distinct. A.10 and B.3 supply the applicable evidence and assurance methods. Connect the evidence to the subject, conditions and interval of the configuration claim. An installed-state claim needs evidence for the identified unit.
  • F.10, A.21, A.2.8.PER, C.11, A.15.1, and A.3.4 distinguish status, gate, permission, choice, Work, and transformation from configuration claims.
  • SYSE.6 can supply applicable architecture constraints. To use them for another configuration, establish the part, interface or operating-range relation on which the constraint depends. Identify actual configuration through evidence for the relevant item.
  • Identify which configuration facts carry over to the change, release or integration increment considered in SYSE.14 or SYSE.11. Use separate authority for release and unit-specific evidence for a claim that a change was carried out.
  • SYSE.7 coordinates several decision-usable descriptions. SYSE.19 revalidates decisions after a relied-on source changes. Co-use creates no additional dependency or temporal order.
  • Application profiles—such as software, electrical, mechanical, manufacturing, medical-device, ship, or building profiles—may specialize item identity, effectivity, interchangeability, evidence, and release when the kinds or uses of Systems designated as project systems-of-interest change the working move.