SYSE.11:7 - Conformance Checklist
- The proposed strategy identifies its starting conditions, constituents, receiving use and criteria for forming or changing the whole. A claim about achieved usability identifies the actual resulting System and configuration for the named use, conditions, interval and deciding Agent.
- Where integration is required, the needed behavior and interactions justify the proposed joint change and progression. An existing strategy can supply those grounds.
- Inputs apply to the receiving subjects, uses and evidence windows directly or on a justified correspondence, and were available before the Work or decisions that relied on them.
- A commissioned assembly, change or witnessed operation is accounted for under its acceptance terms. Where integration or correction was needed, evidence of the actual change establishes what the next step can rely on. An existing result can complete a separate assessment within its scope.
- Work, transformation, actual configuration and the claims in its description remain distinguishable.
- For a proposed progression, can the receiving engineer establish when to advance, correct a mismatch or stop, and why that decision serves the intended use? For an assessment of actual usability, is the whole-use claim supported, including any extension beyond observed conditions, by a sufficient direct result or SYSE.10?
- If the recipient relies on a fallback, its feasibility is established for its own use. Unresolved discrepancies or unsupported claims that affect the decision have a concrete stop or return.
- Separately governed assurance, permission, release and specialist decisions retain their own grounds.
- If later modernization or inquiry is selected, its separate comparison and choice justify the attainable contribution and burden. Otherwise the current result can finish.
- Reopen conditions identify the configuration, use, evidence or relation whose change matters.