SYSE.11:4.2 - Record the Result

Use the existing configuration, integration and assessment records where they already carry the needed content. Use the rows that support the commissioned result. A strategy prepared before integration can identify proposed configurations, transition criteria and evidence to obtain. A conclusion about an achieved change depends on the configuration and work that actually occurred.

ContentWhat the receiving engineer needs
System and useStarting configuration or constituents and first-assembly criteria, intended receiving use, affected Systems and conditions. For an assessment of achieved usability, identify the resulting System and configuration, relevant interval and deciding Agent.
Boundary and progressionWhy the changes belong together, which intermediate configurations are required, when to proceed or stop, and which fallback is available or was used.
Supplied inputsResults relied on, their applicability and evidence windows, and any unresolved blocker or qualified substitute.
Work and actual change, when at issueDated Work, Agents, Methods, subjects, results, transformations and obtaining relations, including discrepancies, corrections and their resulting configurations.
UsabilityWhat each observation or qualified result supports, the consequential inference to the use claim, limits, any unsupported claims and conditions for reconsideration.
Separate decisionsAny assurance, permission, release or specialist decisions that remain to be made for the receiving use.
Later work, when selectedThe separate comparison and choice, attainable contribution, burden, alternatives and reopen condition. No later-work record is required when the assessment completes the current question.