SYSE.11:0 - Use This When
Use this pattern to design the progression by which contributions will form a usable whole, to carry out that integration, or to assess the use an actual engineered System can support. The commission determines the result to deliver. Integration is the broader engineering concern; this pattern develops the bounded move from available contributions to a configuration that supports one receiving use. It includes choosing the integration progression, correcting discovered incompatibilities and assessing the resulting whole.
Begin with the use and what already exists. For a change, identify the existing System and its current configuration. For a first assembly, identify the existing constituents, the intended whole and the relations that must first obtain for that whole to exist. Use any applicable integration strategy or assessment already available. A strategy can supply the grouping, assembly and check order directly. A current qualified result covering the same configuration and use can finish an assessment directly. If the order requires a new assembly, connection or witnessed run, establish which occurrence must be performed and what the authorized recipient can accept. A ready configuration can settle its own fitness in advance. For integration work still needed, choose a sufficient joint change, expose consequential interactions and assess the resulting System with evidence applicable to it.
A proposed integration strategy can finish a design commission when the receiving engineer can use its grouping, order and criteria to decide when to proceed, correct or stop. For an assessment of use, the first useful result is a bounded usability assessment of the actual System in its configuration, with grounds, operating conditions, interval and any limits or needed fallback. The changed System, the Work and transformations that produced its configuration, and this assessment remain distinct. Permission and release are separately governed decisions.
Finish when that result answers the receiving question. If a further change or inquiry could improve a live decision, use C.11.CRC when its finite contribution comparison is missing, then C.11 for the choice. A lack of information about an optional feature does not by itself require further observation.
Use SYSE.14 for authorization or release, SYSE.4 for a load-bearing assurance claim, and Operations Management for continuing queues, allocation or operating control. Specialist assembly, protection and test techniques remain with the practices that qualify them; the integration strategy connects their results and conditions.
SYSE.11:0.1 - Terms and Distinctions
| Name in this pattern | What it denotes |
|---|---|
| increment | A project-relative name for an identified actual System under one resulting configuration, selected for a receiving use. The same System, the transformations that changed it, and configuration claims remain separately identified. |
| usable | A bounded claim that the System in this configuration supports one named use under declared conditions and evidence window. State benefit, assurance, permission, release, reliability or completeness separately when the decision needs them. |
| integration | Dated Work that establishes the relations needed by the intended configuration. A merge, assembly record, installation flag or interface description can supply evidence; the needed relations must obtain. |
| integration progression | The selected grouping and order of integration and checks, with the conditions for proceeding, correcting, revising the grouping or stopping. It can include concurrent Work and intermediate configurations that are useful for learning but not yet usable for the receiving purpose. |
| Work and transformation | An Agent performs dated Work by a Method. A transformation is the actual change of a continuing subject across time. Work can cause or participate in a transformation; the two occurrences remain distinct. |
| actual configuration | The decision-relevant constituents, obtaining relations and characteristic values of an identified System as it exists over an interval, as governed by SYSE.13. A configuration description carries claims about that configuration. |
| modernization | Continuing engineering of an existing System through separately identified bounded changes and resulting configurations. The System’s reidentification rule decides whether it continued or another System began. |
| MVP or continuous engineering | Source-local cues. Recover whether MVP means, for example, a market probe, demonstrator or usable engineering configuration. For continuous, name the overlapping Work and actual changes intended by the source. |