SYSE.10:12 - Relations
C.2.1,A.3.1,A.3.2,A.3.3, andC.29distinguish source and result epistemes, Methods, MethodDescriptions, dynamics, and mathematical-lens use without making them physical results.C.11governs the choice of one next local probe among available options. A specialist experimental-design Method governs a set or sequence of experiments. An authorized Agent applies the relevant Method in decision or experimental-design Work. The Agent assessing available results appliesSYSE.10. Keep the choice or experiment-plan result distinct from the later engineering claim assessment.A.15.1,A.15.2,F.6, andA.15.PRODdistinguish planned Work, dated Work, performer attribution, and result production. A procedure, model or status label alone does not establish that Work occurred; use a report only within its supported claims about that occurrence.C.16,C.16.P, andA.18govern measurement, characteristics, scales, units, uncertainty, and admissible operations.A.10,G.6, andG.11govern evidence use, provenance, and currentness;C.28governs causal and counterfactual support.SYSE.4:4.4supplies the explanation of a consequential inference andSYSE.4:4.6the distinction among joint premises, alternative arguments and shared evidence. This assessment can use those instructions without making an assurance claim.B.3,A.21,G.4, and the applicable acceptance and permission patterns govern the separate assurance, gate and consequence-bearing results.- Assessment Work can supply evidence to
SYSE.6,SYSE.4orSYSE.19when its claim applies directly or the transfer to the receiving subject, configuration and horizon is justified. The receiving Agent exercises its own authority. - Results from engineering Work—for example realization, integration, operation, configuration change, specialist Work, or affected-System inquiry—become evidence only through their source and evidence-use relations. Adjacency between pattern names creates no such relation or temporal order.
- Applied engineering profiles may require different Methods for modeling, simulation, experiments, tests, trials or evidence use when a domain-specific fact—such as the engineered-System kind, physical mechanism, regulation, characteristic, scale or consequence—changes the working move.