STR.Application:1.2 - Frame the uncertainty and preserve a serious rival
The lower price weakens the case for another generic device offer. Existing device and service contracts can still fund current service throughout the twelve-month horizon.
The PSDA.7 account concerns the same decision. Six interviewed customers expressed interest. The installed-base conversion rate remains unknown. The service-cost estimate omits travel and incident coverage. Licensing still lacks evidence of the required data-reuse right.
Two of the six customers are willing to discuss a bounded paid trial next quarter at a stated price ceiling. Agreement to participate and permission for the proposed use remain open. Four already-funded internal engineer-days can complete costing from existing records and specify the smallest relevant trial. This preparation needs no new purchase or customer-data use. Only four discretionary days fall before the Board’s next trial decision.
The Board’s criterion protects current service and its incident reserve first. It then seeks a repeat paid contribution less exposed to generic-inspection price competition. The Board is willing to postpone four days of device-diagnostic improvement for an attainable answer that could alter the service decision.
With STR.3, the team frames two concerns. Existing customers still need the contracted inspection service. For SensorCo, a worthwhile opportunity would provide repeat paid value to customers while reducing exposure to generic-device prices and protecting the incident reserve. A differentiated service would have to meet the customers’ reliability needs at an acceptable price and a support cost the company can sustain. Device-only continuation remains a serious alternative. The licensing option requires an applicable data-reuse right.
For the exit comparison, assume that both orderly exit and device continuation protect current service under the three conditions below. Over twelve months the Board compares exposure avoided, net disposal proceeds, the best attainable use of released resources and consequential later effects. Under its criterion these advantages of exit are outweighed by the continuing device contribution forgone and the full customer-transition burden.
Under those assumptions the Board has grounds to prefer continuation. Reconsider if an exit benefit, transition burden, continuing contribution or protected-service condition could reverse the comparison. A feasible continuation can still lose to a better exit.