STR.9:5 - Archetypal Grounding

STR.9:5.1 - SensorCo: preparation beats a viable rival only under stated conditions

All facts in this case are constructed. SensorCo can sustain its current device and service contracts for twelve months. The Board seeks a repeat paid contribution less exposed to generic-inspection price competition while protecting service and incident reserve.

Two prospective customers may discuss a bounded paid service trial next quarter at a price ceiling, subject to agreement and permitted use. Four funded internal days before the next Board consideration can complete costing and specify a possible trial. They could instead improve device diagnostics.

SensorCo compares spending the next four days on service preparation, which could inform the twelve-month choice, with spending them on device diagnostics.

For the exit comparison, assume that orderly exit and device continuation both satisfy the protected-service requirement under the three conditions below. The supplied comparison for this twelve-month decision includes the exposure avoided, net disposal proceeds, the best attainable use of released resources and any later consequence material to the choice. Under the Board’s criterion, exit’s supported advantages are outweighed by the continuing device contribution forgone and the full customer-transition burden.

Condition at the relevant horizonComparison with device-only continuation and diagnostic workSupported return
Commoditization continues and an accountable-service opportunity remains attainablePreparation can establish whether a relevant service arrangement is economically plausible; diagnostics improve the viable current direction but do not answer that questionPrefer the bounded preparation at the Board’s accepted four-day sacrifice; keep the twelve-month service direction open
Purchasing freezes throughout the horizon, preventing a useful paid trialThe preparation no longer has the stated opportunity to inform this choice; device continuation supports existing obligationsPrefer device-only continuation and retain the four days for diagnostics
Data reuse is restrictedA permitted customer-local service might still be possible, while cross-customer licensing requires its own rightContinue preparation only if an attainable determination leaves a relevant permitted option; otherwise prefer device continuation

The Board supplied this trade-off. Under restricted reuse, only a permitted service arrangement could keep preparation worthwhile. Licensing is not currently selectable without its required reuse right. Under the supplied whole-consequence comparison, continuation is preferable to exit. Reopen that comparison if an exit benefit, transition burden, continuing contribution or protected-service condition changes enough to reverse it; continuation need not become infeasible for exit to become preferable.

Costing can also settle the service question. If no relevant permitted configuration can cover delivery cost at attainable customer terms, the recommendation is device continuation without a trial. A bound covering all relevant configurations can rule them out despite an unknown cost. Seek that cost when its possible values leave the choice undecided.

Later capacity arithmetic answers another question. A proposed 78-person-day configuration fits the 80-day ceiling including protected service and reserve. Strategic merit and delivery capability require supporting evidence of their own. Within its six platform days, two preserve device-compatible interfaces and instructions, postponing a two-day service-diagnostic enhancement. That is the cost of the fallback through the first staged decision. It differs from the four-day device improvement forgone in the present preparation choice.

STR.9:5.2 - The criterion can change the answer even when the numbers do not

In a separate constructed public-service comparison, assume two configurations satisfy the supplied protected-access condition. A model stipulated for this use gives the waiting times below for two demand conditions. No probabilities are assigned.

ConfigurationCondition 1: waiting minutesCondition 2: waiting minutesWorst waiting time
A101212
B41616

Minimizing the worst wait favours A, with a maximum of 12 minutes against B’s 16. For maximum regret, compare each option with the best wait in each condition, 4 and 12 minutes respectively. A’s regrets are 6 and 0 minutes. B’s are 0 and 4. Minimizing maximum regret therefore favours B, with 4 minutes against A’s 6.

Return these two conditional results if no public value rule has been selected. The responsible body determines which rule governs a choice. If B breaches the protected-access condition, apply that condition before comparing regret. The example uses stipulated waiting times.

STR.9:5.3 - SensorCo: two improvements can share one receipt

Consider a constructed later costing comparison, separate from the current four-day preparation and its authority. It concerns a device-health report offer, an alert offer and their combination for one prospective customer over the same twelve months.

Assume that either offer, or both together, would produce one incremental payment of 10,000 currency units at month 12 under the stated acceptance and payment conditions. The complete future additional payments within the horizon are 6,000 for reports, 5,000 for alerts and 11,000 for both. Existing receipts and payments remain unchanged, and the supplied account establishes no other material displaced contribution. The calculation assumes funding on the payment dates, resources and permitted service conditions.

Compared future arrangementIncremental receiptFuture additional paymentsIncremental net cash over twelve months
Continue without either new offer000
Reports only10,0006,0004,000
Alerts only10,0005,0005,000
Reports and alerts10,00011,000−1,000

Adding the two standalone net returns would give 9,000 by counting the same possible receipt twice. Under these assumptions, alerts have the strongest net-cash result. This conditional cash result can inform a strategic comparison. Authorization of a commitment and revenue received require their own grounds.

Now change one premise: a qualified customer basis supports a further 8,000 payable only for the combined offer, with the other cash consequences unchanged. Its receipt becomes 18,000 and its net cash 7,000, reversing the financial ranking. If that extra payment is unsupported, keep it as an unresolved premise rather than adding it or silently setting it to zero. The extra receipt changes the value of combining the offers.

A supporting rate needs the same care. In a separate constructed account, two distinct results each pay 100 units on completion and take two and four hours sequentially on the same resource, with no other delay. Together they yield 200 over six hours, or 33⅓ units per hour, not the sum of their standalone rates, 75. By contrast, independent streams paying 100 and 50 in the same one-hour interval can jointly yield 150 in that interval. Recover the quantities, conditions and interval before aggregating.

These are undiscounted cash comparisons under supplied conditions. For a choice that depends on earlier funding, financing costs or later effects, establish those consequences over the relevant horizon. The current preparation can obtain missing costing or customer answers without claiming that this later comparison has already occurred.

STR.9:5.4 - SensorCo: a central workload can hide the service exposure

This constructed extension examines the proposed 78-engineer-day first-month configuration, separately from the earlier four-day preparation decision. Fix its service scope, team and thirty-day window. A stipulated operating model gives total engineer-day demand, including the protected eight-engineer-day incident reserve, when zero, one or two additional trial requests arrive. These three request conditions are the model’s stated test domain; none has an assigned probability.

Additional trial requestsTotal required engineer-days, including reserve
078
179
284

The central response is 79 engineer-days. The two endpoint responses average 81, two engineer-days higher. These are test values under PSDA.9. An expected workload would require probabilities. With two additional requests, demand is 84 engineer-days against 80 available, four too many. The proposed scope therefore fails the capacity limit in that condition. All three calculations include the protected reserve.

One proposed response is to limit trial admissions to one and defer additional requests. That only narrows exposure if the actual customer terms permit deferral, the remaining service is a useful complete contribution, and the required admission and support arrangement is feasible. Those premises are not supplied here. The two-request condition fails. If an alternative admission arrangement is requested, return the three open conditions before relying on a one-request limit.

The Board can use permitted preparation to clarify that narrower arrangement and its full cost if their answers would materially improve the comparison or choice. Existing device continuation remains a serious alternative. The earlier preparation authorization neither establishes the response model nor funds or limits a future service promise. A sufficient current capacity and terms account would be reused without another test.