Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:25:09 UTC

STR.8:7 - Conformance Checklist

  • The proposed contribution, recipient and sustaining logic are clear.
  • A growth-dependent direction has an explained population and funding loop with matching periods and material delays; an adequate existing account is reused.
  • Material obtaining and exception relations identify what each participant must supply.
  • Where several changes are combined, necessity is qualified by the chosen way, their joint obtaining path is explained, and shared conditions and alternative ways remain visible.
  • Actual support, proposed arrangements and unknowns remain distinct.
  • Method, person, organization, access and technical-result gaps receive different treatment when the conclusion or response depends on the difference.
  • A proposed improvement explains how it would make a useful contribution possible.
  • Shared demands include continuing work and necessary protection.
  • The return states supported feasibility or identifies the missing result and the conclusion or dependent action it limits.
  • Feasibility claims retain their configuration, evidence and authority boundaries.