Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

STR.16:4.4 - Build the joint resource account and repair the whole

Compare candidate arrangements from the same current configuration over the same horizon. Include present commitments, protected reserve, development and continuing obligations. Use an adequate existing account. When a contribution is missing, MA.1–MA.2 can establish resource demand and capacity, OCE.11 can examine coexistence with current operations, and STR.14 can reconcile simultaneous strategic work.

Count the work of producing a reusable result once when it can serve the covered receivers. Two executions of the same method can consume separate time even if their outputs agree. Add application effort wherever an actual or proposed receiver must perform it. If one person works as researcher, methodologist and mentor, compare the combined demand with that person’s availability. Pool resources only if their capabilities and time windows make them interchangeable for the receiving use. Preserve separate demands on compute, AI engineers, researchers and mentors even when they all have prices.

Begin at the coarsest time window that can expose a decisive conflict. Refine to a week, shift or booked session when timing could defeat the combination. Include preparation, learning, supervision, integration, feedback, failures, recovery and the work of constructing and maintaining the coordination itself where they are needed. A feasible total can conceal an impossible first week.

Establish who may choose which work arrives, which provider performs it and when a commitment becomes irreversible. For a fixed set of orders a workable allocation in time can be sufficient. For a guaranteed portfolio result, the participants need a feasible way to achieve the agreed result throughout the permitted combinations. A criterion applying to each recipient, a proportion required in each period and an agreed probability of timely service need different grounds. For a probability target, compare the supported risk with the accepted limit. At each choice, group the outcomes the responsible participant cannot yet tell apart. Choose an action with a workable continuation throughout that group. Several schedules each chosen with hindsight can use knowledge the dispatcher will lack. A sufficient standing allocation or common bound with a means of supply can settle the issue without scheduling each case separately. OPS.13:4.3

Keep three accounts distinct where the decision uses them:

  • the work and scarce capacity consumed;
  • the payments required, with their actual dates and funding conditions;
  • any assigned share used for reporting or charging.

Use MA.3 if an allocation convention is needed. Cancelling a research branch can release staff time without avoiding its assigned share of a cash payment. Identify what payment or supply would actually change. MA.8 can help account for later service obligations. Funding the present start depends on money available by the payment date.

To resolve a conflict, change the configuration enough to show how the revised contribution would reach its recipient. Possible changes include narrowing a result, moving work with a flexible deadline, obtaining a qualified substitute, changing what is shared or deferring an independent branch. Preserve the receiver’s criteria for the same result. A narrower research question or service can be complete if it retains its required criticism or response to exceptions.

Reassess the uses that depend on a changed shared contribution. If research supplies no required input to a delayed product, the research may continue. If both need the same scarce scientist, reallocation may nevertheless change both schedules. Trace the receiving dependency and competition for capacity separately.

When refusing the proposed portfolio as infeasible, establish why every permissible way of supplying it falls short of the agreed criterion. For a guarantee, one allowed shortfall for each way can defeat the guarantee. For a risk or proportion target, compare the risk or attainable proportion for that way with the promised threshold. A single argument or bound can cover several ways. A conflict in one tested allocation leaves the others open. If a commitment already binds, identify a remedy or refer a proposed revision to its holder. Count overtime, volunteer work, financing and future research results on grounds appropriate to each.