STR.14:4.1 - Anchor the conflict in actual or proposed work
Name the strategic subject, question or decision to be informed, useful contribution, relevant horizon and specific interference. Distinguish an observed conflict in performed work from a prospective conflict in a plan or intended-use case.
For work that took place, use evidence of what happened and under which conditions. For a proposed arrangement, state the configuration, assumptions and what would establish that it can work. Use evidence of performance if a later conclusion concerns successful execution.
Follow the relations that could establish the answer or change its grounds. Select the questions below that matter to the case.
| Question | Relation to recover |
|---|---|
| How is the required result obtained? | The parts of the way of working and any required order among its actions. |
| Which work interferes with other work? | Actual or planned work that overlaps, depends on another result or competes for the same performer, time window or other resources. |
| What is being changed? | The work’s relation to the subject it changes, such as a product, organization, person or platform. |
| What does the description represent? | The plan or model’s correspondence to the work or subject being described, including a material condition it omits. |
| What makes performance possible? | The capability and access the performer needs, and any contribution the work needs from a provider. |
| Who can change the commitment? | Each decision holder’s authority over the scope, timing, resources or permitted use at issue. |
SensorCo needs preparation before customer use and interpretation. Incident response must continue during the trial and requires some of the same engineers. The trial method establishes what must precede use. Compare its staffing demand during that period with the people needed to maintain incident response.
Preserve these relations when comparing a narrower trial, changed timing or a qualified substitute. A sequence-only roadmap would hide the continuing incident demand, while a monthly total can hide the critical-day collision examined in section 5.1.