STR.11:5 - Archetypal Grounding
STR.11:5.1 - SensorCo selects four days, not a service business
In this constructed case, SensorCo’s device-only continuation can meet existing service obligations for twelve months. The StrategyTeam advises. The case assigns the Board authority to select the direction and make the bounded internal commitment.
The comparison retains devices, integrated service, licensing and segment exit as different strategic directions. Six interviewed customers expressed interest, but that supports only those responses. Two may discuss a bounded paid trial next quarter at a price ceiling, subject to agreement and permitted use. Full travel and incident-support costs are not yet known, and licensing lacks an established required reuse right.
The team recommends the following use of the four days.
Use four funded internal days to complete service costing and specify the smallest worthwhile trial against the prospective customers’ terms. Postpone the four-day device-diagnostic improvement. Protect current service and reserve, retain viable device continuation and leave the twelve-month service direction open.
The stated reason is comparative: an attainable cost-and-trial answer can open or reject a relevant repeat paid contribution less exposed to generic price competition, at the sacrifice the Board is willing to make. Device continuation remains viable under the stated terms.
The Board then selects that preparation and authorizes those four days. The case stipulates this Board decision separately from the recommendation. No new purchase or new customer-data use is part of the preparation.
The team also has a possible first-month development configuration: 8 days for preparation and, only when permitted, initial trial use and interpretation; 6 for platform work; and 4 for learning/support. With 52 days of current service and an 8-day incident reserve, that is 78 of 80. The four authorized days lie inside the eight-day envelope. The remaining development work still requires authorization.
The three development contributions are candidates for joint use in that configuration, not three independently funded projects. Establish their supporting conditions and decide on any later inclusion at the relevant scope. The four strategic directions remain alternatives; retaining them does not schedule them together.
The reconsideration conditions also remain explicit. A sufficient costing result that rules out every relevant permitted service configuration supports device continuation without a trial. A full-horizon purchasing freeze removes the preparation’s stated opportunity. A missing required right blocks its dependent use. For later permitted trial use, a shared-work forecast received before the next allocation and exceeding the 80-day ceiling while preserving reserve causes the service owner to suspend the dependent trial activity within its agreed authority; the Board reconsiders scope.
STR.11:5.2 - A filter admits a proposal, not its expenditure
This filter selects changes to start this quarter. Each must reduce total customer rework on orders handled by the affected process in the first two weeks after the change starts, relative to continuing that process. The reduction must be checkable by the end of those weeks. Each change must avoid irreversible migration for now. Eligibility leaves resource commitment to its decision holder.
A reversible correction to error-handling information is proposed for this quarter, has support for reducing rework and can be checked within two weeks. It fits the filter. A branding proposal with no evidence about rework remains unresolved on that condition. A change requiring irreversible migration fails the current filter.
The decision holder can now compare the fitting proposal’s contribution, whole cost and displaced work. If the holder selects it, identify the bounded work and check which resources the authorized decision allocates.
Suppose the responsible body later changes the rule to allow irreversible migration with specified transition protection. That can reopen the migration’s eligibility. Rework, timing, checking, technical feasibility, transition protection and authorization retain their own conditions. If the change was merely proposed, actual selection continues under the existing rule. Preserve the earlier comparison’s basis rather than rewriting its observations.
STR.11:5.3 - A personal recommendation leaves the person’s choice intact
A self-directed professional has eight discretionary hours per week. A proposed direction needs six hours of study and six of client development. An adviser can state that twelve hours exceed eight. If a different course is requested, compare a smaller scope, substitution or deferral. The person decides how to allocate their hours.
If an attractive two-hour exploration cannot answer the live question, the person may postpone it. A complete recommendation can therefore end with a supported smaller option or stop, without adopting the larger direction or commissioning an assessment that the decision does not need.