SIE.10:4 - Solution
State the conclusion at the scope its evidence supports. A known decisive failure or bounded unresolved premise can finish with sufficient evidence for that result. For a positive whole-use or contract-permitted narrower result, obtain matching evidence for every load-bearing premise, including the receiver’s interpretation. Use earlier results when their conditions still match. Preserve hard stops and distinguish unexamined premises from passing ones.
SIE.10:4.1 - Pattern-Use Unfolding
Steps 3–10 locate the grounds for the claim at issue. A supported finding can finish at step 2 when it settles that claim. For each remaining obligation, use an applicable rule, prior result or new observation according to what it establishes. A specification can settle what behaviour is prescribed. A claim that this implementation produced a response, or that a recipient acted on it, needs evidence of that occurrence. Perform a new test when commissioned or when the available grounds leave an important behaviour open.
- Identify the validation subject. Name the mapping, interface, or package result and receiving use being judged. Record the revisions and conditions on which the conclusion depends.
- Choose the conclusion and inspect known evidence. Take the relevant answer claim and stop condition from
SIE.1. If a demonstrated defect already defeats it, return that bounded failure with sufficient evidence. If a necessary technical premise is unresolved, identify the affected claim. Apply the receiving authority’s separate acceptance rule. When a required record is absent at the contractual deadline, the authority can refuse that release while the technical property remains unknown. Keep the grounds for that decision distinct from evidence of a technical failure. For a positive claim, derive all load-bearing distinctions, loss, currentness/service/quality, authority, protection, branch, and representative-use obligations. - Validate carrier and schema. Test parseability, declared schemas/shapes, required fields, datatypes, cardinalities, identifiers, and branch encodings. Treat a pass as structural only.
- Validate semantic-model and endpoint adequacy. Test whether source and target concepts, types, relations, constraints, units/codes, and any supplied model express the required distinctions throughout the scope claimed. Use discriminating cases where these distinctions remain in doubt.
- Validate correspondences and mappings. Challenge the accepted
SIE.4relations under the conditions of use. Establish whether theSIE.7rule preserves selection, cardinality, conversion, defaults, errors, loss and trace where the claim relies on them. For implementation behaviour, use suitable execution evidence or a conformance argument that covers the actual implementation. - Validate identity and authority. For each identity disposition used in the conclusion, establish what the source entries designate at the grain the decision requires. Check the issuer, version, effective interval, part–whole relation, reuse or split/merge where differences there could change the attribution. Preserve an unresolved branch that affects the decision. Verify required authority and permission inputs from their governing basis.
- Validate claim composition. Test
SIE.6comparability, conflict, non-comparability, supersession, incomplete-source, and uncertainty branches. Confirm that source claims and derivation remain recoverable. - Validate realization and interface behavior. Test currentness, latency, availability, snapshot/caching, invalidation, source failure, partial results, access/protection, provenance, error semantics, and challenge paths required by
SIE.8andSIE.9. A timed response establishes this execution’s elapsed time. For a guarantee across loads, establish a bound under the admitted joint request and resource conditions. A percentile requires evidence for the specified request population and measure. - Validate provenance, currentness, and quality. Check that every relied-on output can recover its source and rule premises, that source/version/time status satisfies the use, and that selected quality measurements meet their action-changing thresholds. Do not treat provenance or process conformance as truth.
- Establish the receiving result. Follow the qualified output to the action or judgement the recipient needs. Use matching earlier evidence when it covers the interpretation, terms and setting. Where the interpretation or behaviour remains uncertain, replay the use under conditions that discriminate the outcomes. For an order to run the query or observe the workflow, obtain evidence of that performance. If the order also calls for a particular reviewer’s independent judgement, establish what that reviewer examined and decided with the assistance permitted by the order.
- Assign dispositions at the supported scope. Use pass, narrow, unresolved, or stop for tested claims, and preserve any material unexamined reach. A positive narrow result states the contract-permitted subset and covers all of that subset’s load-bearing premises; excluded branches remain explicit. A hard stop cannot be offset by scores elsewhere.
- Record repairs, returns, and reopen. Send source, semantic, mapping, implementation, authority, or receiver defects to their direct owners; state which layer and consumers require retest after change.
SIE.10:4.2 - Record the Result
| Validation position | Required content |
|---|---|
| subject and use | package/interface revision, source/rule versions, realization/test state, receiver and use |
| obligations | premises relevant to the claimed conclusion; all load-bearing contract obligations for a positive use claim |
| layer result | layer, tested claim, method/case, evidence, expected/observed result, pass/narrow/unresolved/stop, defect owner |
| dependency | source, correspondence, identity, composition, mapping, realization or interface premise consumed |
| coverage | examined cases and matching earlier results; material unexamined or unresolved premises, distinguished from passing ones |
| use disposition | supported local failure or gap, or positive result with its conditions and full load-bearing coverage; excluded subset and hard stops |
| continuation | repairs or direct-owner returns, focused retest, affected consumers, reopen condition |
SIE.10:4.3 - What Changes in Practice
The team stops asking whether “the integration” passed one test. Each claim has an appropriate layer, evidence, and owner. A bounded subset can be used without hiding excluded rows, and a source or rule repair triggers focused revalidation instead of an automatic full rebuild or a silent continuation.