RMP.Application:1.3 - Second fork — answer the current research-allocation question
For the question in the brief, use an adequate existing finding. If further research remains under consideration, compare attainable experimental, observational or model-based approaches with the course of commissioning no new study. Judge each by what it could resolve under the actual conditions.
| Changed supplied value | RMP.2 disposition |
|---|---|
| Applicable evidence meets the brief’s answer condition by supporting, narrowing or rejecting the proposed acceleration relation within the scope of the brief. | EvidenceSufficientStop. State the supported answer and any consequential limits or evidence that would revise it. |
| Domain engineering supplies the indicator relation, measurement feasibility, material identity, safe operating envelope and necessary authority. An experiment best distinguishes acceleration-induced mechanism change. | A ResearchDesignDecision selects the comparison and its criticism. Retain as a PostSelectionNeed a missing record locator or serialization detail only when its possible values leave that selection unchanged. |
| The indicator’s discrimination is unknown, the team must choose the comparison before it learns the result, and no justified selection covers both possibilities. | A ResearchDesignHold identifies the needed measurement finding, its source, the alternatives it affects, the outcome under each possible value, the work that must wait and what would permit it to proceed. |
| Evidence remains insufficient, and material, access or cost rules out any worthwhile attainable new study for this case. | QualifiedNoNewStudy. Give the allocation decision and its grounds, the remaining uncertainty or narrower answer, and any change that would warrant reconsideration. |
A hold identifies a missing value that can alter a design selection still needed. A decision against a new study can stand while the mechanism question remains unresolved. For a selected design, retain its comparison and limits. Use RMP.3 to specify any consequential operations that the design leaves open or to assess a supplied protocol.