Jump to text
On this page
Copy and source
Upstream freshness not yet confirmed

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:45:17 UTC

RMP.8:5.1 - Keep the laboratory result, withdraw the unsupported field prediction

In the example an engineer receives a synthesis supporting a positive mean difference in seal lifetime under specified accelerated laboratory conditions. The existing model makes the following three claims.

Existing contributionSupplied criticism and revision
The fitted wear relation describes the dry laboratory material over the tested range.The analysis supports the relation within that range. Retain the parameter, fit and uncertainty for that scope.
The same wear rate applies in the wet service environment.The synthesis covers dry accelerated tests. Withdraw the statement that this research demonstrated the wet-service rate. Its applicability there remains open.
A service replacement time follows from the laboratory rate and the engineering wear limit.The arithmetic can still be correct. Its use for replacement time depends on the unestablished wet-service rate, so withdraw the prediction as an established field result. The engineering authority retains its wear-limit criterion.

The engineer can report that the laboratory relation holds within the tested range. The synthesis supplies no basis for carrying the dry wear rate unchanged into wet service, so it cannot establish the derived replacement time there. Cite the laboratory result and identify the missing transfer premise.

Different dry and wet rates are one hypothesis. A suitable field comparison could examine it if the work is feasible and what it could establish warrants the cost. RMP.2 and RMP.6 can help make that choice. Give the reliability authority the bounded finding for its maintenance decision. The research return can finish with that correction even if the operational choice remains open.