RMP.3:10 - Architectural Rationale
Use RMP.2 to select an evidence strategy and RMP.3 to specify its operations. During specification, check that every jointly admissible remaining choice still preserves the selected evidence relation, criticism and feasibility. When it does not, report the consequence for selection.
A protocol specifies intended work. A trace records what happened. Both may be kept in one notebook and may develop together. If what happened in an inherited study is unclear, use RMP.4 to examine its surviving trace. Available records may already answer the question even when its original protocol is lost.
Use a suitable domain protocol and adequate records directly. Examine the connection to the research question when a consequential operation, change or limitation remains unclear. A measurement problem, interpretive inquiry and historical source comparison may each need a different explanation of that connection.