RMP.11:5.1 - Descriptive Stop

Suppose a design office needs to reconcile names and source editions after drawing signoff differentiated. For this example, A.3.1 identification and A.3.1.MV variant qualification already establish M-Signoff-0 and local variants M-Signoff-E and M-Signoff-M. All return approve or reject for a drawing. The electrical variant requires clearance and harness-revision checks, the mechanical variant load-case and fit checks. Each withholds approval when its required check is absent. These are independently established differences in the local Methods. The question here concerns the timing of their documentation and use.

The office needs to establish when the different checks were approved and used in the surviving records, and when separate electronic forms represented them. Dated instructions and Work records can answer those questions even if the first-ever use is unknown.

The case also identifies ElectricalReviewer-E and MechanicalReviewer-M as Agents for the respective checks under A.13, and their 9 and 18 April occurrences WE7 and WM4 as Work under A.15.1. They enacted M-Signoff-E and M-Signoff-M using the respective E1 and M1 instructions. The following records form the source set.

Date and sourceRecoverable fact and limit
15 January 2024, signoff instruction S3A common instruction covers both drawing types and requires the presence of evidence. Neither local variant’s distinct test-and-withhold rule appears in S3. Whether somebody used either check earlier remains open.
4 March, exception log X2, and 11 March, proposal P1X2 records two returned drawings, one lacking electrical-clearance evidence and one lacking the mechanical load case. P1 cites these exceptions, proposes the two domain-specific rules and retains common signoff with expert escalation as an alternative. This establishes a stated reason for the proposal.
2 April, approval A14 and instructions E1/M1A14 approves the two local variants for the respective drawings. E1 and M1 specify different checks and returns for failure. A14 leaves the common-with-escalation proposal unselected. The deliberation minutes are missing.
9 and 18 April, signoff Work WE7/WM4 and their annotated resultsIn WE7, ElectricalReviewer-E followed E1 and withheld approval for missing clearance evidence. In WM4, MechanicalReviewer-M followed M1 and withheld it for a missing load case. These records establish two enactments before the forms separated. Earlier occurrences and the extent of uptake remain open.
6 May, PLM migration note T2 and form edition F2F2 introduces separate electronic forms and names for approval records. T2 states that they carry the E1/M1 rules already in use. The change documented here concerns how those rules are represented.

Before examining the April records, the office considers two accounts. R-demand attributes the proposal and selection to domain-specific omissions. It predicts a problem record, a response proposal and distinct checks before migration. R-carrier attributes the apparent split to the May change in recording or naming. It predicts unchanged checks under the new forms. The March returns and proposal make R-demand plausible. The searchable PLM history begins with F2, which makes a recording change plausible until the earlier instructions and Work are examined.

E1/M1 specify distinct checks and WE7/WM4 record their enactment in April, before F2. That contradicts the strong R-carrier claim of a naming-only change in May. The records fit R-demand. They leave open why the office chose separate rules over common signoff with escalation and what other pressures contributed. The deliberations are missing. A within-case inquiry might investigate the missing link through further sources. A possible contribution of the carrier to later retention also remains open.

DA-Signoff-Differentiation-1 returns these grades and limits:

ClaimGrade and allowed use
The common and domain-specific instructions differ in the named required checks and stops.Source-supported by S3/E1/M1; Method identity and variant qualification remain the separate case premises.
Separate rules were approved by 2 April and enacted in the named April occurrences.Source-supported by A14 and WE7/WM4. The dates bound the documented approval and two uses. The first-ever use and extent of uptake remain open.
The March exceptions were a stated reason for proposing the variants.Source-supported by P1. The effect of those exceptions on selection needs its own evidence.
The split was merely a May renaming with no earlier semantic difference.Contradicted by the April instructions and Work records.
Demand caused selection over common signoff with escalation, or the carrier contributed to later retention.Missing causal support for these links. The deliberation evidence and evidence of later continuation are incomplete.

In DA-Signoff-Differentiation-1, retain S3 as the common predecessor account, E1 and M1 as different variant descriptions and F2 as their later forms. The dates and observed signoffs answer the reconciliation question. The first occurrences and reasons for selection remain unresolved. An earlier instruction, a deliberation record or contrary Work evidence could revise the relevant claim. A request to choose a present architecture would introduce a different decision.