Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:40:20 UTC

RHY.8:9 - Consequences

A practitioner can propose or assess a variant in its place in the larger passage and can test it there when a trial is needed. A rejected construction can locate the limiting phase, setup, allocation, coordination or continuing contribution. That finding can guide a different construction when one is needed.

One adequate variant may suffice. Retain several when their different contributions support uses the practitioner needs to distinguish.