Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

RHY.13:7 - Conformance Checklist

  • A current assignment rests on what the relevant person or arrangement can supply. A transfer or retention claim connects that contribution to the same holder’s earlier performance, the changed task or intervening interval, and the support on both occasions.
  • The account identifies the rhythmic relation and the changed condition or interval at issue.
  • The result states which needed information, convention, physical capability and support were present, absent or unknown.
  • Instruction and earlier attempts are reflected in the result’s scope.
  • For an observed passage, the result identifies whose action or selection the evidence establishes, including a response made within a pair. A proposal ruled out by an established physical limit can be assessed before anyone attempts it. A claim of acquired capability establishes a change under comparable conditions; attributing it to particular instruction has grounds for that attribution.
  • A failed or unresolved result states what is established and what remains open. Further testing, practice or a change of arrangement serves a remaining task.