Jump to text
On this page
Copy and source
Original source · lines 92–101
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:05:20 UTC

A comparison can be correct and still answer too little

In a constructed pump inquiry, rated capacity and access to assistance when roads fail pose different questions. A model can establish a pump’s rated capacity while leaving open whether affected people can reach help or a mobile pump can be deployed. PSDA.1–PSDA.3 help identify the corresponding formulations, boundaries and model requirements.

Suppose fixed pumps have losses of 2 with normal roads and 3 when road access is lost, at cost 8. Mobile pumps have corresponding losses of 1 and 9, at cost 5. If p is the assumed probability of road loss and λ the assumed cost weight, lower scores are preferable. The scores are 2 + p + 8λ and 1 + 8p + 5λ. Fixed pumps score lower when 7p > 1 + 3λ. At λ = 0.5, mobile pumps score lower for p = 0.2 and fixed pumps for p = 0.6.

PSDA.6 distinguishes the assumed trade-off from protected service requirements. PSDA.7 identifies the missing basis for the road-loss probability. PSDA.8 supplies the conditional comparison and PSDA.9 its reversal. These calculations leave both assumptions open for the investment decision. The incumbent and a staged alternative may also matter. Return the conditional result or obtain the further premises needed for whole-investment advice.

Suppose evidence now establishes that mobile deployment is unavailable in the required window. The mobile alternative cannot be used there. The earlier comparison remains valid under its original condition and the fixed-pump calculation keeps its stated scope. An analyst can finish with that result. An adviser can use PSDA.14 to explain its implications to the recipient. The investment decision remains with its authorized holder.