PSDA.9:4.5 - Connect the remaining uncertainty to information value
Identify an attainable observation, calculation or interpretation that could change the requested finding, its grounds, eligibility or the action available. Compare its expected contribution with the cost and delay. A large change in a numerical output may leave the relevant conclusion unchanged.
For an expected-utility comparison, use MMP.16:4.2–4.5 to model the records the proposed observation could produce. For each record, find the highest conditional expected utility among the actions then available. Weight these values by the probabilities of the records, and compare their sum with the best expected utility available without the observation. For a record with a continuous distribution, use the corresponding expectation. Include collection cost, delay, any change to the system and lost opportunities in the consequences of the compared options. Subtract a cost directly from expected utility only if it is additive on that scale and has not already been counted. Use PSDA.6:4.5.6 if a required utility account must be constructed. If several probability and utility accounts are compatible, report the comparisons within each account or the supported range. Averaging accounts needs separate grounds. Perfect information can bound the benefit of information under the same actions and conditions. Several observations may supply overlapping information.
If the probabilities lack support, report the result under the specified conditions and what a feasible observation could resolve. Calculate an expected value on stipulated probabilities only for an explicitly conditional question.
When selecting a further probe, use C.11 or the applicable decision procedure to compare the attainable options, budget, benefits and costs. Identify the authority required for execution. A dispute about a value or mandate may need a judgement by its holder.