Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:50:07 UTC

PSDA.8:5.1 - A flood-service comparison with no scenario-free winner

Continue the illustrative next-season case with N, F, M, and S: continue the present arrangement, change fixed capacity, obtain a mobile reserve arrangement, or use a staged combination.

Suppose a later qualified deployment analysis now provides the previously missing conditional operating results for M. A compatible resource estimate and service model provide the following hypothetical analytical slice. Costs are incremental budget units above the common continuing baseline; service loss is hours when the specified pumping service is unavailable. Lower is preferred on both measures for this slice. No scenario probability is supplied.

AlternativeIncremental budget unitsService-loss hours with normal accessService-loss hours with road loss
N — continuing baseline0711
F — fixed-capacity change823
M — mobile-reserve arrangement519
S — staged combinationNot yet qualifiedNot yet qualifiedNot yet qualified

The values are stipulated for this comparison. Reachable assistance and property-loss consequences remain outside the numerical slice. Their values and protected conditions may block an overall recommendation.

Under normal access, M costs less and has fewer service-loss hours than F. Under road loss, F loses fewer service hours but costs more. Thus the slice establishes no condition-independent dominance between F and M. N uses fewer incremental resources but loses more service hours; zero incremental cost does not mean that the baseline has no continuing obligations or consequences.

For S, identify the whole-arrangement result that is still missing. The narrower relations among N, F and M remain usable. They leave the complete four-candidate recommendation open.