Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:15:10 UTC

PSDA.18:4.8 - Refresh the affected relation or stop

Reopen the affected question when a change to a carrier, Method, population, receiving condition, source, authority or observation period alters its grounds. An intervention may also lose necessary support or produce evidence against the expected consequence. Trace the change to the claims it affects.

A departure may remove mentoring capacity without proving that the Method was forgotten. A software update may alter which examples are visible without changing the decision-support Method. A source correction may invalidate one taught inference while leaving the rest usable. State the actual consequence and retain independent claims.

For known reliance on a source, use A.10 when the connection to the use is implicit or a needed reproducible account is missing. When a material change to a source claim puts earlier uses in question, use A.10.1 to discover the affected uses or jointly revalidate several known uses. Use G.11 for currentness or refresh planning under its conditions. Publication and access have their own evidence. To establish continuation, examine the receiving practice.

Close with the supported answer and its material limits. If a later observation has been selected, retain its conditions. If a protected condition fails, costs outweigh the intended contribution or continuation lacks grounds, apply the authorized stop or recovery rule. Where a decision is still needed, return the condition to its holder.