Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

PHY.6:7 - Conformance Checklist

  • The intended physical consequence and relevant preparation determine the scope of the construction.
  • Each balance names the selected quantity, physical transfers and any production or conversion.
  • Response and configuration relations supply the dependencies needed for the answer, with their physical grounds and conditions.
  • Connected descriptions agree on exchanged quantities, signs, units and frames; consequential connection storage or dynamics remain represented.
  • Independent initial and boundary conditions are compatible with the coupled relations, and dependent conditions are derived.
  • The first consequence is obtained or a particular missing response or incompatible preparation directs the next work.
  • Checks and further inquiry concern what can change the intended use; mathematical consequence, computational accuracy and physical adequacy remain distinguishable.