OPS.Reference:1.2 - Recover the relations that make an operation possible

Several kinds of dependence connect operating units. A later action may need a result produced earlier. Two actions may compete for the same resource. A permission or state condition may enable an action without being consumed by it. Several outputs may have to be present together before the recipient can accept the result. A commitment connects participants through what they have undertaken to provide. These relations determine which continuations are available; a single sequence or one organization chart may show only some of them.

Describe an operating arrangement by explaining how those dependencies will be satisfied. Identify the contribution of each action, how its result reaches its receiver, what shared means it occupies, and how a return or exception changes the remaining work. For a known manufacturing method this may yield a repeatable route with alternative machines. For a service case, new facts can select the next permitted action. For continuing infrastructure service, maintenance and incident response preserve an operating condition across many episodes. The work can overlap, repeat or branch in each arrangement. OPS.2 chooses views for these different questions; OPS.11 and OPS.11.1 recover the dependencies that the views must preserve.

Start with the operating decision. Compare what the model included before and after the change. For example, a diagram may show an analysis with no performer, with an unspecified external performer or with a particular laboratory. Naming the laboratory can introduce a participant into the model or identify one already represented. The same analysis may be due in all three descriptions. To establish who actually performed it, consult evidence from that execution. If a new analysis is due under the order, that analysis can form part of the work on it. If a suitable existing report meets the need, the present work uses the report. To establish whether the earlier analysis was also part of this order, check which work the order comprised. For a capacity decision the model can combine jobs that make interchangeable demands. For accepting the order it may have to retain which specimen each result covers at that same scale. Producing a result, maintaining the means of production and improving the method can form functional layers when their production-and-use relations organize the account. Interfaces let teams or equipment modules coordinate as peers. To identify modular levels, state what orders the modules, such as enclosure within a composite module or an acyclic dependency on other modules. Use that order for the decision it supports. A replacement can require checking the enclosing module’s interfaces while leaving the work schedule open. One team can contribute in several functional layers and several modules can jointly perform one function. FPF C.30.STRAT:4.2 explains how to recover the relation from working language.

The resulting description is knowledge about a possible or actual arrangement. To realize the arrangement, participants must obtain the needed contributions and access, and establish the necessary agreements. Performing the actions produces dated work and results. A changed description, a changed reusable method, a changed allocation and a changed organization can therefore lead to different next actions even when all are described as “changing the process”. OPS.16 qualifies method change; OCE.4 and OCE.6 supply organization design and effective assignment where those relations must change. An ordinary operating allocation can reuse an already sufficient arrangement.