| Every operation has one permanently named bottleneck. | Distributed delay and changing regimes are excluded before observation. | State the result-relative limiting relation and allow unresolved or multiple mechanisms. |
| A fast local step proves whole-operation improvement. | Acceptance, joins and rework may dominate the result. | Preserve the accepted unit and inspect the whole relevant path. |
| A capacity ratio is a feasible schedule. | Precedence, access and simultaneous-resource conditions can defeat it. | Establish a workable order under those conditions or give a sufficient argument for its existence. Return a timed schedule when one is commissioned. |
| A generic causal checklist replaces the field probe. | No actual admissible change or observation is specified. | Name the professional Method, changed action, comparison and stop. |
| A successful treatment remains the answer forever. | The arrangement and limiting relation have changed. | Reopen the account after the material change. |