Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:35:20 UTC

OPS.8:6 - Bias-Annotation

BiasConsequenceCountermeasure
board-boundary biasWaiting disappears when an item leaves a local column.Retain the operation’s population and waiting origin.
zero-buffer idealProtection is removed together with avoidable congestion.State the disturbance and shortage consequence before changing the amount.
complete-kit absolutismEvery future result is demanded before any useful action can start.Define readiness for the next service, not for the whole case’s eventual completion.
local-utilization pressureMore starts create incomplete kits and downstream waiting.Inspect the accepted result and receiver-ready inputs.
pooling optimismMean efficiency hides class-specific or failure-related loss.Compare the actual service criterion and resource assumptions.