OPS.8.2:4.4 - Compare useful gain with the whole interruption cost

Compare feasible auxiliary candidates with leaving the interval unused. Retain the result each candidate could supply and the work needed to obtain it, including preparation, interruptions, lost partial progress, later auxiliary resumption and any new obligations.

An already-paid salary does not make those consequences vanish. Use OPS.14 when the choice or its economic justification depends on the financial comparison. Use OPS.12 when repeated transitions can impair continuing human service. Observe a trial through OPS.16 or A.3.1.WT when an unresolved operating effect justifies one; do not demand a new experiment when the available comparison already settles the choice.

If development is the intended gain, C.40.OI and C.40.DC construct the opportunity and transition. For a human capability goal, use HCD.2 to arrange the required practice, feedback and support. For current ability, examine the learner’s own work under the support allowed later. A claim of acquisition also needs grounds about what the learner could do before. Use HCD.14:4.2.1 when the question is how much the exercise contributed. An interruptible activity can fit the reserve and still teach little. C.39.MF and A.3.1.WT support a method-improvement question and its trial. Use the development results to assess the intended gain. Check its compatibility with the operation by calculating the full return to protected service.

Choose the simplest adequate arrangement. The choice may favor a short useful unit, preparation outside the protected resource, another resource, a later window or continued availability.