OPS.8.1:4.5 - Define the actions at release and feedback

Choose the next eligible work and the condition under which it can start. Make the condition usable in the operation’s existing account: for example a freed loop place together with a reserved correction window, or a remaining-load calculation updated at inspection.

When the need for a return becomes known, replace its contingent allowance with the required work and identify when its inputs, access and resources will be available. Apply the priority and placement rule under those conditions. Keep the original customer clock. A repeated service visit may restart a station’s own interval without restarting the customer’s wait.

When a suitable event rules out the return, remove only the allowance that the event actually resolves, then reconsider held work. At late or ambiguous feedback, update the possible demand and the time left; absence of a message alone does not establish acceptance.

Observe whether the rule changes completion, total waiting, resource starvation, actual correction burden and displaced work. Reopen it when the return route, feedback time, service duration, resource access, product mix or receiving requirement changes. Stop redesigning once the existing inputs support a usable rule or a specific choice requiring changed conditions.